DatasetPress / Michigan explorer

Michigan Water main line stop Unit Prices

91 usable historical bid-price observations across 7 projects and 5 agencies. Bid dates 2023-07-07 to 2026-05-01.

Records classified as Water main line stop in the 2026 Edition. Compare the original item descriptions before applying these prices to a specific scope.

Search and filter these prices

This broad source category can include installation, removal, repair and connection work. These are not interchangeable scopes or new-installation quotes. Review the original descriptions and narrow your search before comparing prices.

EA · 91 observations

$9,000.00 median per EA

Middle 50%: $7,000.00–$12,147.50

Full observed range

$250.00–$36,000.00. Extreme bids may not represent typical scope.

All-bidder observations, not unique projects or winning bids. Prices are historical USD per stated unit, without inflation or regional adjustment. The middle 50% is P25–P75, calculated with linear interpolation. Price summaries require at least 10 observations, 3 projects and 3 agencies per unit; smaller groups are omitted. Different sizes, materials and scopes can still vary within a unit. Outliers are retained. These are research comparisons, not construction estimates or quotes.

Sample records

Showing 15 fixed public samples of 91 matching records.

Fixed public sample — original descriptions and source references
Item / scopeUnitUnit priceProject / agencyBid dateSource
_Water Main, Line Stop, 6 inch, ModifiedEA$7,000.00MDOT Proposal 39000-206259: 1.65 mi of hot mix asphalt surfacing, concrete curb, gutter and sidewalk ramps, watermain, sanitary sewer and pavement markings on Westnedge Avenue from Vine Street to Cork Stre...City of Kalamazoo2023-07-07MDOT-20230707-038
_Temporary Water Main Line Stop, 8 inchEA$8,000.00MDOT Proposal 81000-214689: Completion Date: June 1, 2027 0.60 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer repairs, water main replacement, si...City of Ann Arbor2026-03-06MDOT-20260306-034
_Temporary Water Main Line Stop, 20 inchEA$12,225.00MDOT Proposal 81000-214689: Completion Date: June 1, 2027 0.60 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer repairs, water main replacement, si...City of Ann Arbor2026-03-06MDOT-20260306-034
_Temporary Water Main Line Stop, Additional Rental DayEA$650.00MDOT Proposal 81000-214725: 1.08 mi of roundabout installation including hot mix asphalt reconstruction, watermain, storm sewer, lighting, signing and pavement markings along Nixon Road between Huron Parkw...City of Ann Arbor2025-04-04MDOT-20250404-043
_Temporary Water Main Line Stop, 8 inchEA$10,000.00MDOT Proposal 81000-214689: Completion Date: June 1, 2027 0.60 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer repairs, water main replacement, si...City of Ann Arbor2026-03-06MDOT-20260306-034
Water Main, 8-inch Line StopFlagged price outlierEA$9,582.00Sewer Separation Program Contract No. 1 - Stormwater Force Main and Gravity SewerCity of Grosse Pointe Farms2025-02-19HRC005
Water Main, 16 inch, Line StopFlagged price outlierEA$36,000.00Gate Valve Replacement 2025Meridian Township2025-06-05DIR005
_Temporary Water Main Line Stop, 12 inchEA$9,000.00MDOT Proposal 81000-214689: Completion Date: June 1, 2027 0.60 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer repairs, water main replacement, si...City of Ann Arbor2026-03-06MDOT-20260306-034
Water Main Line Stop, 8 inchEA$5,325.00MDOT Proposal 50000-217681: 1.00 mi of concrete road reconstruction, water main replacement, concrete sidewalk and ramps and pavement markings on Frazho Road from Hoover Road to Schoenherr Road in the city...City of Warren2024-12-06MDOT-20241206-051
_Water Main Line Stop, 16 inch, ModifiedEA$9,709.89MDOT Proposal 39000-206259: 1.65 mi of hot mix asphalt surfacing, concrete curb, gutter and sidewalk ramps, watermain, sanitary sewer and pavement markings on Westnedge Avenue from Vine Street to Cork Stre...City of Kalamazoo2023-07-07MDOT-20230707-038
_Temporary Water Main Line Stop, 16 In.EA$18,710.00MDOT Proposal 81000-214725: 1.08 mi of roundabout installation including hot mix asphalt reconstruction, watermain, storm sewer, lighting, signing and pavement markings along Nixon Road between Huron Parkw...City of Ann Arbor2025-04-04MDOT-20250404-043
Water Main, 8-inch Line StopFlagged price outlierEA$12,000.00Sewer Separation Program Contract No. 1 - Stormwater Force Main and Gravity SewerCity of Grosse Pointe Farms2025-02-19HRC005
_Temporary Water Main Line Stop, 16 In.EA$18,000.00MDOT Proposal 81000-214725: 1.08 mi of roundabout installation including hot mix asphalt reconstruction, watermain, storm sewer, lighting, signing and pavement markings along Nixon Road between Huron Parkw...City of Ann Arbor2025-04-04MDOT-20250404-043
Water Main, 16 inch, Line StopEA$11,728.33Gate Valve Replacement 2025Meridian Township2025-06-05DIR005
_Temporary Water Main Line Stop, 6 In.EA$11,060.00MDOT Proposal 81000-214725: 1.08 mi of roundabout installation including hot mix asphalt reconstruction, watermain, storm sewer, lighting, signing and pavement markings along Nixon Road between Huron Parkw...City of Ann Arbor2025-04-04MDOT-20250404-043