EA · 114 observations
$6,660.00 median per EAMiddle 50%: $5,500.00–$8,466.61
Full observed range
$2,500.00–$21,200.00. Extreme bids may not represent typical scope.
DatasetPress / Michigan explorer
114 usable historical bid-price observations across 11 projects and 5 agencies. Bid dates 2023-02-03 to 2026-07-10.
Records classified as Water main connection in the 2026 Edition. Compare the original item descriptions before applying these prices to a specific scope.
Search and filter these pricesThis broad source category can include installation, removal, repair and connection work. These are not interchangeable scopes or new-installation quotes. Review the original descriptions and narrow your search before comparing prices.
Middle 50%: $5,500.00–$8,466.61
$2,500.00–$21,200.00. Extreme bids may not represent typical scope.
All-bidder observations, not unique projects or winning bids. Prices are historical USD per stated unit, without inflation or regional adjustment. The middle 50% is P25–P75, calculated with linear interpolation. Price summaries require at least 10 observations, 3 projects and 3 agencies per unit; smaller groups are omitted. Different sizes, materials and scopes can still vary within a unit. Outliers are retained. These are research comparisons, not construction estimates or quotes.
Showing 15 fixed public samples of 114 matching records.
| Item / scope | Unit | Unit price | Project / agency | Bid date | Source |
|---|---|---|---|---|---|
| _Connection To Existing 12 inch Water Main | EA | $9,262.23 | MDOT Proposal 73000-218737: 0.23 mi of historic brick pavement reconstruction, concrete sidewalks and water main replacement on Cass Street from Niagara Street to Michigan Avenue in the city of Saginaw, Sa...City of Saginaw | 2025-03-07 | MDOT-20250307-059 |
| _Connection to Existing 6 inch Water Main | EA | $5,350.00 | MDOT Proposal 73000-216281: 0.61 mi of hot mix asphalt reconstruction and widening, bike lanes, drainage improvements, watermain, concrete curb and gutter, ramps, sidewalk, signing, and permanent pavement...City of Saginaw | 2026-02-06 | MDOT-20260206-039 |
| _Water Main Connection, 12 inchFlagged price outlier | EA | $14,000.00 | MDOT Proposal 63000-132535: 1.20 mi of concrete road reconstruction, widening, water main, sewer main, drainage improvements, concrete sidewalk and ramps, permanent signing, traffic signals, and pavement m...City of Troy | 2025-10-03 | MDOT-20251003-019 |
| _Connection To Existing 8 inch Water Main | EA | $5,500.00 | MDOT Proposal 73000-216278: 0.50 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, water main, signing and pavement markings on Hess Avenue from Jefferson Avenue to Sheridan...City of Saginaw | 2025-02-07 | MDOT-20250207-019 |
| _Connection To Existing 12 inch Water Main | EA | $6,650.00 | MDOT Proposal 73000-216278: 0.50 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, water main, signing and pavement markings on Hess Avenue from Jefferson Avenue to Sheridan...City of Saginaw | 2025-02-07 | MDOT-20250207-019 |
| _Connection To Existing 6 inch Water Main | EA | $6,300.00 | MDOT Proposal 73000-216278: 0.50 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, water main, signing and pavement markings on Hess Avenue from Jefferson Avenue to Sheridan...City of Saginaw | 2025-02-07 | MDOT-20250207-019 |
| _Connection To Existing 8 inch Water Main | EA | $7,050.00 | MDOT Proposal 73000-216278: 0.50 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, water main, signing and pavement markings on Hess Avenue from Jefferson Avenue to Sheridan...City of Saginaw | 2025-02-07 | MDOT-20250207-019 |
| Water Main Connection, 8 Inch to Ex. 8 Inch | EA | $4,590.00 | Vernor Estates Water Main ReplacementBloomfield Township | 2025-04-15 | HRC004 |
| Water Main Connection, 12 Inch to Ex. 8 Inch | EA | $7,500.00 | Vernor Estates Water Main ReplacementBloomfield Township | 2025-04-15 | HRC004 |
| _Connection to Existing 4 inch Water Main | EA | $3,950.00 | MDOT Proposal 73000-205672: 0.61 mi of hot mix asphalt reconstruction, concrete curb, gutter and ramps, water main, signing and pavement markings on Mackinaw Street from Alexander Street to Congress Avenue...City of Saginaw | 2023-02-03 | MDOT-20230203-038 |
| _Connection To Existing 12 inch Water Main | EA | $7,500.00 | MDOT Proposal 73000-216278: 0.50 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, water main, signing and pavement markings on Hess Avenue from Jefferson Avenue to Sheridan...City of Saginaw | 2025-02-07 | MDOT-20250207-019 |
| _Water Main Connection, 12 inch | EA | $6,500.00 | MDOT Proposal 50000-225605: Completion Date: September 19, 2028 4.55 mi of hot mix asphalt shared-use path, concrete curb and sidewalks, water main and sanitary sewer, traffic signal work, signing and pave...City of Sterling Heights | 2026-07-10 | MDOT-20260710-054 |
| _Connection To Existing 10 inch Water Main | EA | $7,800.00 | MDOT Proposal 73000-216276: 0.54 mi of hot mix asphalt base crushing, shaping and resurfacing, concrete curb, gutter and sidewalk ramps, water main, signing and pavement markings on Sheridan Avenue from Tr...City of Saginaw | 2023-11-03 | MDOT-20231103-034 |
| _Connection to Existing 6 inch Water Main | EA | $4,575.00 | MDOT Proposal 73000-205672: 0.61 mi of hot mix asphalt reconstruction, concrete curb, gutter and ramps, water main, signing and pavement markings on Mackinaw Street from Alexander Street to Congress Avenue...City of Saginaw | 2023-02-03 | MDOT-20230203-038 |
| _Water Main Connection, 8 inch | EA | $5,115.93 | MDOT Proposal 63000-132535: 1.20 mi of concrete road reconstruction, widening, water main, sewer main, drainage improvements, concrete sidewalk and ramps, permanent signing, traffic signals, and pavement m...City of Troy | 2025-10-03 | MDOT-20251003-019 |