EA · 458 observations
$2,794.00 median per EAMiddle 50%: $800.00–$7,400.00
Full observed range
$129.00–$15,258.00. Extreme bids may not represent typical scope.
DatasetPress / Michigan explorer
478 usable historical bid-price observations across 59 projects and 36 agencies. Bid dates 2023-01-06 to 2026-07-17.
Records classified as Hydrant assembly in the 2026 Edition. Compare the original item descriptions before applying these prices to a specific scope.
Search and filter these pricesThis broad source category can include installation, removal, repair and connection work. These are not interchangeable scopes or new-installation quotes. Review the original descriptions and narrow your search before comparing prices.
Middle 50%: $800.00–$7,400.00
$129.00–$15,258.00. Extreme bids may not represent typical scope.
All-bidder observations, not unique projects or winning bids. Prices are historical USD per stated unit, without inflation or regional adjustment. The middle 50% is P25–P75, calculated with linear interpolation. Price summaries require at least 10 observations, 3 projects and 3 agencies per unit; smaller groups are omitted. Different sizes, materials and scopes can still vary within a unit. Outliers are retained. These are research comparisons, not construction estimates or quotes.
Showing 15 fixed public samples of 478 matching records.
| Item / scope | Unit | Unit price | Project / agency | Bid date | Source |
|---|---|---|---|---|---|
| Hydrant, Rem | EA | $650.00 | MDOT Proposal 61000-214126-2: 0.14 mi of hot mix asphalt surfacing, concrete curb, gutter, sidewalk and upgrade sidewalk ramps, storm sewer, water main and pavement markings on Fleming Street from Ruddiman D...City of North Muskegon | 2023-10-06 | MDOT-20231006-019 |
| Hydrant Assembly, RemovalFlagged price outlier | EA | $1,899.00 | Sewer Separation Program Contract No. 1 - Stormwater Force Main and Gravity SewerCity of Grosse Pointe Farms | 2025-02-19 | HRC005 |
| Hydrant, Rem | EA | $200.00 | MDOT Proposal 61000-214126-2: 0.14 mi of hot mix asphalt surfacing, concrete curb, gutter, sidewalk and upgrade sidewalk ramps, storm sewer, water main and pavement markings on Fleming Street from Ruddiman D...City of North Muskegon | 2023-10-06 | MDOT-20231006-019 |
| _Fire Hydrant, Modified | EA | $7,500.00 | MDOT Proposal 82000-219392: 0.56 mi of reconstruction of 2 intersections as a roundabout including hot mix asphalt cold milling and resurfacing, concrete pavement removal, concrete curb, gutter, sidewalk a...City of Northville | 2025-07-11 | MDOT-20250711-051 |
| Fire Hydrant Assembly, Complete | EA | $8,000.00 | Vernor Estates Water Main ReplacementBloomfield Township | 2025-04-15 | HRC004 |
| _Fire Hydrant Assembly, Rem | EA | $945.00 | MDOT Proposal 81000-214725: 1.08 mi of roundabout installation including hot mix asphalt reconstruction, watermain, storm sewer, lighting, signing and pavement markings along Nixon Road between Huron Parkw...City of Ann Arbor | 2025-04-04 | MDOT-20250404-043 |
| _Fire Hydrant and Valve Assembly | EA | $9,000.00 | MDOT Proposal 76000-214375: 0.31 mi of hot mix asphalt reconstruction, concrete curb, gutter and sidewalk ramps, storm sewer and pavement markings on Stewart Street from Shiawassee (M-52) to Washington Str...City of Owosso | 2024-01-05 | MDOT-20240105-051 |
| _Hydrant Assembly, Modified | EA | $6,590.10 | MDOT Proposal 70000-215674: 0.35 mi of hot mix asphalt reconstruction, storm sewer, concrete curb, gutter, sidewalk and ramps and pavement markings on Fulton Avenue from North 1st Street southeasterly to N...City of Grand Haven | 2025-04-04 | MDOT-20250404-044 |
| _Hydrant, 5 inch | EA | $4,000.00 | MDOT Proposal 41000-215848: Completion Date: September 24, 2027 0.21 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, water main and pavement markings on Valley...City of Grand Rapids | 2026-03-06 | MDOT-20260306-018 |
| _Hydrant, Complete, 6 inch | EA | $7,630.29 | MDOT Proposal 73000-218737: 0.23 mi of historic brick pavement reconstruction, concrete sidewalks and water main replacement on Cass Street from Niagara Street to Michigan Avenue in the city of Saginaw, Sa...City of Saginaw | 2025-03-07 | MDOT-20250307-059 |
| _Hydrant, Rem, Modified | EA | $1,250.00 | MDOT Proposal 73000-216276: 0.54 mi of hot mix asphalt base crushing, shaping and resurfacing, concrete curb, gutter and sidewalk ramps, water main, signing and pavement markings on Sheridan Avenue from Tr...City of Saginaw | 2023-11-03 | MDOT-20231103-034 |
| Hydrant, Rem | EA | $500.00 | MDOT Proposal 76000-208231: 0.49 mi of hot mix asphalt reconstruction, concrete curb, gutter repair and sidewalk ramps, storm sewer and pavement markings on North Street from M-52 to Hickory Street in the...City of Owosso | 2023-01-06 | MDOT-20230106-039 |
| Hydrant Assembly, Rem | EA | $450.00 | Vernor Estates Water Main ReplacementBloomfield Township | 2025-04-15 | HRC004 |
| Hydrant, Rem | EA | $900.00 | MDOT Proposal 50000-217681: 1.00 mi of concrete road reconstruction, water main replacement, concrete sidewalk and ramps and pavement markings on Frazho Road from Hoover Road to Schoenherr Road in the city...City of Warren | 2024-12-06 | MDOT-20241206-051 |
| Hydrant, Rem | EA | $600.00 | MDOT Proposal 61000-214126-2: 0.14 mi of hot mix asphalt surfacing, concrete curb, gutter, sidewalk and upgrade sidewalk ramps, storm sewer, water main and pavement markings on Fleming Street from Ruddiman D...City of North Muskegon | 2023-10-06 | MDOT-20231006-019 |